The HS Manager is racking inspection software for PRRS checks and expert inspections. Record faults to beam level and rate them red, amber or green to SEMA guidance.
Trusted by UK racking inspectors and warehouse teams
What does UK law require for racking inspections?
Warehouse racking is work equipment under PUWER 1998, so it must be maintained and inspected. HSE guidance (HSG76) and BS EN 15635 expect a named Person Responsible for Racking Safety (PRRS), regular visual inspections and an expert inspection at least every 12 months.
Regular visual inspections by the PRRS
Typically weekly, at a frequency set by the site’s risk assessment.
Expert inspection at least every 12 months
By a technically competent person, for example a SEMA Approved Racking Inspector (SARI).
Damage reported and acted on
Every defect recorded, rated and repaired within the timescale its rating requires.
The HS Manager helps you record and evidence these inspections. It does not replace the competent person who carries them out.
How does The HS Manager rate racking damage?
Every fault is given a red, amber or green rating in line with SEMA guidance, so the action required is clear to everyone on site.
Red: offload immediately
Offload the affected racking and isolate the area until it is repaired.
Amber: repair within four weeks
Once offloaded, do not reload until repaired. If not repaired within four weeks, treat it as red.
Green: within tolerance
Record the damage and recheck it at the next inspection.
Which racking inspection templates are included?
Racking Inspection
The formal inspection report, locating each fault to beam level with a rating, photo and recommendation.
Racking Visual Inspection Record (PRRS)
The PRRS’s weekly log of aisles checked, faults found, actions taken and repairs completed.
Racking Inspection Damage Report
Records each defect with the damaged component, measurement, rating, photo and dated repair sign-off.
Racking Identification, Design and Conformity
Audits design, installation certificates, load notices, protection and PRRS arrangements against BS EN 15635.
How does it work for professional racking inspectors?
Inspect offline in every aisle
Record faults with no signal and sync when you are back online.
Locate every fault to beam level
Run, bay and beam captured against each defect, so repairs go to the right place.
Photo evidence on every fault
Photographs attach to the defect they show as you take them.
Customer sign-off on site
Your customer signs on the device and receives a branded PDF report the same day.
How does it work for in-house PRRS teams?
A weekly PRRS record that is always complete
Every visual inspection is timestamped, signed and stored in one place.
Repairs assigned from the inspection
Raise a corrective action from any failed answer and assign it with a due date.
One view across every site
See racking inspections and open actions across all your warehouses on one dashboard.
What does a finished racking inspection report look like?
Every inspection produces a branded PDF report in seconds. This is a real example from The HS Manager.
Where and when the inspection took place, who carried it out and the reference it is filed under.
Each fault names its run and location, down to the beam level, so the repair team knows exactly where to go.
What is wrong and what to do about it, side by side on the same row.
Every fault is rated red, amber or green to SEMA guidance, in a column that is quick to scan.
Date and time stamped photos sit with the report, so each fault has its own evidence.
The customer and the inspector sign with name and date, so the report is a finished record.
What do racking inspectors say about The HS Manager?
Want to see more? Open sample forklift, daily H&S and racking reports, and browse every checklist category.
See sample reports →One platform, one subscription
The mobile app, the multi-site dashboard, the racking templates and all 72 checklists come with every HS Manager account. Same login, same price.
Racking inspection software: frequently asked questions
How often must warehouse racking be inspected?
- BS EN 15635 and HSE guidance (HSG76) expect regular visual inspections by the PRRS, commonly weekly at a frequency set by the site’s risk assessment, and an expert inspection at least every 12 months by a technically competent person.
What do red, amber and green mean in a racking inspection?
- Red means offload immediately and isolate the area until repaired. Amber means repair within four weeks and do not reload once offloaded. Green means the damage is within tolerance and should be recorded and rechecked at the next inspection.
What is a PRRS?
- The Person Responsible for Racking Safety is the named person on site who owns racking safety. They arrange regular visual inspections, keep the damage record and make sure repairs are completed.
Does racking inspection software replace an expert inspection?
- No. The HS Manager records and evidences inspections, but the annual expert inspection must still be carried out by a technically competent person, for example a SEMA Approved Racking Inspector.
Can I record racking inspections without a mobile signal?
- Yes. The app works offline, so you can inspect every aisle with no signal and the inspection syncs when you are back online.
Can my customer sign the racking report on site?
- Yes. Your customer signs on the device at the end of the inspection, and the signed PDF report is ready to share straight away.
Ready to run your next racking inspection digitally?